¡@
FAQ¡@
Q1.
What year did Besraya start tolling?
¡@
A1.
Although the first section of the highway was completed in 1998 before
the Commonwealth Games, Besraya only began tolling at its Mines
South and Mines North Toll Plazas in January 1999. This facilitated the
dispersal of traffic during the games in 1998.
Tolling
at the second section through the Salak Jaya Toll Plaza started in April
1999. This signified the total completion of the Besraya or Sungai
Besi Highway.
Q2.
How long is the Besraya Highway?
¡@
A2.
The Besraya Highway is approximately 16.5 kilometers. This
represents the distance from our starting point (chainage 0.0) at the UPM
Interchange all the way to the end point (chainage 16.5) at the Istana
Interchange.
Q3.
What is the company's slogan and what does it mean?
¡@
A3.
The slogan for Besraya (M) Sdn Bhd is 'The Better Alternative'.
Why? Because the slogan signifies the objectives of our company
that are:-
-
To
provide an alternative route to travelers currently utilizing
existing over crowded roads
-
While
being better by providing a safer, more convenient and stress
free (jam free) ride to our users.
In
summary it means that we shall strive to be consistently and continually
better than other alternative highways or roads.
Q4.
What is Besraya Corporate Color?
¡@
A4.
Besraya's corporate image is represented by the color green. This color
was chosen inline with what our commitment to the environment, as well as in
selecting a soothing and non-threatening effect.
¡@
Thank
You For Your Time
If
the answer to your questions are not available, feel free to contact our
Besline (information line) at 1-800-88-0999, or email us at info@besraya.com.my
¡@